UNITED STATES
SECURITIES AND EXCHANGE COMMISSION
Washington, D.C. 20549
FORM 10-Q
(Mark One)
ý
QUARTERLY REPORT PURSUANT TO SECTION 13 OR 15(d) OF THE SECURITIES EXCHANGE ACT OF 1934
For the quarterly period ended March 31, 2019
or
¨
TRANSITION REPORT PURSUANT TO SECTION 13 OR 15(d) OF THE SECURITIES EXCHANGE ACT OF 1934
Commission file number 1-31219
ENERGY TRANSFER OPERATING, L.P.
(Exact name of registrant as specified in its charter)
Delaware
 
73-1493906
(State or other jurisdiction of incorporation or organization)
 
(I.R.S. Employer Identification No.)
8111 Westchester Drive, Suite 600, Dallas, Texas 75225
(Address of principal executive offices) (zip code)
Registrant’s telephone number, including area code: (214) 981-0700
Indicate by check mark whether the registrant (1) has filed all reports required to be filed by Section 13 or 15(d) of the Securities Exchange Act of 1934 during the preceding 12 months (or for such shorter period that the registrant was required to file such reports), and (2) has been subject to such filing requirements for the past 90 days.  Yes  ý    No  ¨
Indicate by check mark whether the registrant has submitted electronically every Interactive Data File required to be submitted pursuant to Rule 405 of Regulation S-T (§232.405 of this chapter) during the preceding 12 months (or for such shorter period that the registrant was required to submit such files).    Yes  ý    No  ¨
Indicate by check mark whether the registrant is a large accelerated filer, an accelerated filer, a non-accelerated filer, a smaller reporting company or an emerging growth company. See the definitions of “large accelerated filer,” “accelerated filer,” “smaller reporting company” and “emerging growth company” in Rule 12b-2 of the Exchange Act.
Large accelerated filer
 
ý
 
Accelerated filer
 
¨
Non-accelerated filer
 
¨
 
Smaller reporting company
 
¨
 
 
 
 
Emerging growth company
 
¨
If an emerging growth company, indicate by check mark if the registrant has elected not to use the extended transition period for complying with any new or revised financial accounting standards provided pursuant to Section 13(a) of the Exchange Act. ¨
Indicate by check mark whether the registrant is a shell company (as defined in Rule 12b-2 of the Exchange Act).    Yes  ¨    No  ý
Securities registered pursuant to Section 12(b) of the Act:
Title of each class
 
Trading Symbol(s)
 
Name of each exchange on which registered
7.375% Series C Fixed-to-Floating Rate Cumulative Redeemable Perpetual Preferred Units
 
ETPpC
 
New York Stock Exchange
7.625% Series D Fixed-to-Floating Rate Cumulative Redeemable Perpetual Preferred Units
 
ETPpD
 
New York Stock Exchange
7.600% Series E Fixed-to-Floating Rate Cumulative Redeemable Perpetual Preferred Units
 
ETPpE
 
New York Stock Exchange
7.500% Senior Notes due 2020
 
ETP 20
 
New York Stock Exchange
4.250% Senior Notes due 2023
 
ETP 23
 
New York Stock Exchange
5.875% Senior Notes due 2024
 
ETP 24
 
New York Stock Exchange
5.500% Senior Notes due 2027
 
ETP 27
 
New York Stock Exchange
 


Table of Contents

FORM 10-Q
ENERGY TRANSFER OPERATING, L.P. AND SUBSIDIARIES
TABLE OF CONTENTS
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 


i

Table of Contents

Forward-Looking Statements
Certain matters discussed in this report, excluding historical information, as well as some statements by Energy Transfer Operating, L.P. (the “Partnership” or “ETO”) in periodic press releases and some oral statements of the Partnership’s officials during presentations about the Partnership, include forward-looking statements. These forward-looking statements are identified as any statement that does not relate strictly to historical or current facts. Statements using words such as “anticipate,” “believe,” “intend,” “project,” “plan,” “expect,” “continue,” “estimate,” “goal,” “forecast,” “may,” “will” or similar expressions help identify forward-looking statements. Although the Partnership and its General Partner believe such forward-looking statements are based on reasonable assumptions and current expectations and projections about future events, no assurance can be given that such assumptions, expectations, or projections will prove to be correct. Forward-looking statements are subject to a variety of risks, uncertainties and assumptions. If one or more of these risks or uncertainties materialize, or if underlying assumptions prove incorrect, the Partnership’s actual results may vary materially from those anticipated, projected or expected, forecasted, estimated or expressed in forward-looking statements since many of the factors that determine these results are subject to uncertainties and risks that are difficult to predict and beyond management’s control. For additional discussion of risks, uncertainties and assumptions, see “Part I – Item 1A. Risk Factors” in the Partnership’s Annual Report on Form 10-K for the year ended December 31, 2018 filed with the Securities and Exchange Commission on February 22, 2019.
Definitions
The following is a list of certain acronyms and terms generally used in the energy industry and throughout this document:
 
/d
 
per day
 
 
 
 
 
AOCI
 
accumulated other comprehensive income (loss)
 
 
 
 
 
BBtu
 
billion British thermal units
 
 
 
 
 
Btu
 
British thermal unit, an energy measurement used by gas companies to convert the volume of gas used to its heat equivalent, and thus calculate the actual energy used
 
 
 
 
 
Capacity
 
capacity of a pipeline, processing plant or storage facility refers to the maximum capacity under normal operating conditions and, with respect to pipeline transportation capacity, is subject to multiple factors (including natural gas injections and withdrawals at various delivery points along the pipeline and the utilization of compression) which may reduce the throughput capacity from specified capacity levels
 
 
 
 
 
CDM
 
CDM Resource Management LLC and CDM Environmental & Technical Services LLC, collectively
 
 
 
 
 
Citrus
 
Citrus, LLC, which owns 100% of FGT
 
 
 
 
 
DOJ
 
United States Department of Justice
 
 
 
 
 
EPA
 
United States Environmental Protection Agency
 
 
 
 
 
ET
 
Energy Transfer LP
 
 
 
 
 
ETP GP
 
Energy Transfer Partners GP, L.P., the general partner of ETO
 
 
 
 
 
ETP LLC
 
Energy Transfer Partners, L.L.C., the general partner of ETP GP
 
 
 
 
Exchange Act
 
Securities Exchange Act of 1934
 
 
 
 
 
FEP
 
Fayetteville Express Pipeline LLC
 
 
 
 
 
FERC
 
Federal Energy Regulatory Commission
 
 
 
 
 
FGT
 
Florida Gas Transmission Company, LLC
 
 
 
 
 
GAAP
 
accounting principles generally accepted in the United States of America
 
 
 
 
 
IDRs
 
incentive distribution rights
 
 
 
 
 
Lake Charles LNG
 
Lake Charles LNG Company, LLC (previously named Trunkline LNG Company, LLC)
 
 
 
 
 
LIBOR
 
London Interbank Offered Rate
 
 
 
 
 
MBbls
 
thousand barrels
 
 
 
 
 
MEP
 
Midcontinent Express Pipeline LLC
 
 
 
 


ii

Table of Contents

 
MTBE
 
methyl tertiary butyl ether
 
 
 
 
 
NGL
 
natural gas liquid, such as propane, butane and natural gasoline
 
 
 
 
 
NYMEX
 
New York Mercantile Exchange
 
 
 
 
 
OSHA
 
federal Occupational Safety and Health Act
 
 
 
 
 
OTC
 
over-the-counter
 
 
 
 
 
Panhandle
 
Panhandle Eastern Pipe Line Company, LP and its subsidiaries
 
 
 
 
 
PES
 
Philadelphia Energy Solutions Refining and Marketing LLC
 
 
 
 
 
Regency
 
Regency Energy Partners LP
 
 
 
 
 
Rover
 
Rover Pipeline LLC, a subsidiary of ETO
 
 
 
 
 
SEC
 
Securities and Exchange Commission
 
 
 
 
 
Series A Preferred Units
 
6.250% Series A Fixed-to-Floating Rate Cumulative Redeemable Perpetual Preferred Units
 
 
 
 
 
Series B Preferred Units
 
6.625% Series B Fixed-to-Floating Rate Cumulative Redeemable Perpetual Preferred Units
 
 
 
 
 
Series C Preferred Units
 
7.375% Series C Fixed-to-Floating Rate Cumulative Redeemable Perpetual Preferred Units
 
 
 
 
 
Series D Preferred Units
 
7.625% Series D Fixed-to-Floating Rate Cumulative Redeemable Perpetual Preferred Units
 
 
 
 
 
Series E Preferred Units
 
7.600% Series E Fixed-to-Floating Rate Cumulative Redeemable Perpetual Preferred Units
 
 
 
 
 
Transwestern
 
Transwestern Pipeline Company, LLC
 
 
 
 
 
Trunkline
 
Trunkline Gas Company, LLC, a subsidiary of Panhandle
 
 
 
 
 
USAC
 
USA Compression Partners, LP
 
 
 
 
 
USAC Preferred Units
 
USAC Series A Preferred Units
Adjusted EBITDA is a term used throughout this document, which we define as total Partnership earnings before interest, taxes, depreciation, depletion, amortization and other non-cash items, such as non-cash compensation expense, gains and losses on disposals of assets, the allowance for equity funds used during construction, unrealized gains and losses on commodity risk management activities, non-cash impairment charges, losses on extinguishments of debt and other non-operating income or expense items. Unrealized gains and losses on commodity risk management activities include unrealized gains and losses on commodity derivatives and inventory valuation adjustments (excluding lower of cost or market adjustments). Adjusted EBITDA reflects amounts for less than wholly-owned subsidiaries based on 100% of the subsidiaries’ results of operations and for unconsolidated affiliates based on our proportionate ownership.


iii

Table of Contents

PART I – FINANCIAL INFORMATION
ITEM 1. FINANCIAL STATEMENTS
ENERGY TRANSFER OPERATING, L.P. AND SUBSIDIARIES
CONSOLIDATED BALANCE SHEETS
(Dollars in millions)
(unaudited)
 
March 31, 2019
 
December 31, 2018
ASSETS
 
 
 
Current assets:
 
 
 
Cash and cash equivalents
$
516

 
$
418

Accounts receivable, net
4,312

 
4,009

Accounts receivable from related companies
174

 
176

Inventories
1,722

 
1,677

Income taxes receivable
48

 
73

Derivative assets
70

 
111

Other current assets
313

 
356

Current assets held for sale
28

 

Total current assets
7,183

 
6,820

 
 
 
 
Property, plant and equipment
80,295

 
79,280

Accumulated depreciation and depletion
(13,282
)
 
(12,625
)
 
67,013

 
66,655

 
 
 
 
Advances to and investments in unconsolidated affiliates
2,647

 
2,636

Lease right-of-use assets, net
872

 

Other non-current assets, net
1,007

 
1,006

Long-term receivables from related company
5,229

 
440

Intangible assets, net
5,912

 
6,000

Goodwill
4,885

 
4,885

Total assets
$
94,748

 
$
88,442


The accompanying notes are an integral part of these consolidated financial statements.
1

Table of Contents

ENERGY TRANSFER OPERATING, L.P. AND SUBSIDIARIES
CONSOLIDATED BALANCE SHEETS
(Dollars in millions)
(unaudited)
 
March 31, 2019
 
December 31, 2018
LIABILITIES AND EQUITY
 
 
 
Current liabilities:
 
 
 
Accounts payable
$
3,965

 
$
3,491

Accounts payable to related companies
53

 
119

Derivative liabilities
85

 
185

Operating lease current liabilities
68

 

Accrued and other current liabilities
2,294

 
2,847

Current maturities of long-term debt
157

 
2,655

Total current liabilities
6,622

 
9,297

 
 
 
 
Long-term debt, less current maturities
46,241

 
37,853

Non-current derivative liabilities
150

 
104

Non-current operating lease liabilities
817

 

Deferred income taxes
2,982

 
2,884

Other non-current liabilities
1,154

 
1,184

 
 
 
 
Commitments and contingencies

 

Redeemable noncontrolling interests
499

 
499

 
 
 
 
Equity:
 
 
 
Limited Partners:
 
 
 
Series A Preferred Unitholders
943

 
958

Series B Preferred Unitholders
547

 
556

Series C Preferred Unitholders
440

 
440

Series D Preferred Unitholders
434

 
434

Common Unitholders
25,909

 
26,372

Accumulated other comprehensive loss
(34
)
 
(42
)
Total partners’ capital
28,239

 
28,718

Noncontrolling interest
8,044

 
7,903

Total equity
36,283

 
36,621

Total liabilities and equity
$
94,748

 
$
88,442


The accompanying notes are an integral part of these consolidated financial statements.
2

Table of Contents

ENERGY TRANSFER OPERATING, L.P. AND SUBSIDIARIES
CONSOLIDATED STATEMENTS OF OPERATIONS
(Dollars in millions)
(unaudited)
 
Three Months Ended
March 31,
 
2019
 
2018
REVENUES:
 
 
 
Refined product sales
$
3,726

 
$
3,603

Crude sales
3,525

 
3,256

NGL sales
2,402

 
2,235

Gathering, transportation and other fees
2,267

 
1,430

Natural gas sales
964

 
1,062

Other
237

 
296

Total revenues
13,121

 
11,882

COSTS AND EXPENSES:
 
 
 
Cost of products sold
9,415

 
9,245

Operating expenses
808

 
724

Depreciation, depletion and amortization
771

 
661

Selling, general and administrative
149

 
147

Impairment losses
50

 

Total costs and expenses
11,193

 
10,777

OPERATING INCOME
1,928

 
1,105

OTHER INCOME (EXPENSE):
 
 
 
Interest expense, net
(527
)
 
(380
)
Equity in earnings of unconsolidated affiliates
65

 
79

Losses on extinguishments of debt
(2
)
 
(109
)
Gains (losses) on interest rate derivatives
(74
)
 
52

Other, net
17

 
57

INCOME FROM CONTINUING OPERATIONS BEFORE INCOME TAX EXPENSE (BENEFIT)
1,407

 
804

Income tax expense (benefit)
126

 
(10
)
INCOME FROM CONTINUING OPERATIONS
1,281

 
814

Loss from discontinued operations

 
(237
)
NET INCOME
1,281

 
577

Less: Net income attributable to noncontrolling interest
256

 
164

Less: Net income attributable to redeemable noncontrolling interest
13

 

Less: Net loss attributable to predecessor equity

 
(302
)
NET INCOME ATTRIBUTABLE TO PARTNERS
$
1,012

 
$
715


The accompanying notes are an integral part of these consolidated financial statements.
3

Table of Contents

ENERGY TRANSFER OPERATING, L.P. AND SUBSIDIARIES
CONSOLIDATED STATEMENTS OF COMPREHENSIVE INCOME
(Dollars in millions)
(unaudited)
 
Three Months Ended
March 31,
 
2019
 
2018
Net income
$
1,281

 
$
577

Other comprehensive income (loss), net of tax:
 
 
 
Change in value of available-for-sale securities
5

 
(2
)
Actuarial gain (loss) related to pension and other postretirement benefit plans
7

 
(2
)
Change in other comprehensive income from unconsolidated affiliates
(4
)
 
5

 
8

 
1

Comprehensive income
1,289

 
578

Less: Comprehensive income attributable to noncontrolling interest
256

 
164

Less: Comprehensive income attributable to redeemable noncontrolling interest
13

 

Less: Comprehensive loss attributable to predecessor equity

 
(302
)
Comprehensive income attributable to partners
$
1,020

 
$
716


The accompanying notes are an integral part of these consolidated financial statements.
4

Table of Contents

ENERGY TRANSFER OPERATING, L.P. AND SUBSIDIARIES
CONSOLIDATED STATEMENTS OF EQUITY
FOR THE THREE MONTHS ENDED MARCH 31, 2019 AND 2018
(Dollars in millions)
(unaudited)
 
Three Months Ended March 31, 2019
 
Limited Partners
 
 
 
 
 
 
 
Series A Preferred Unitholders
 
Series B Preferred Unitholders
 
Series C Preferred Unitholders
 
Series D Preferred Unitholders
 
Common Unitholders
 
AOCI
 
Non-controlling Interest
 
Total
Balance, December 31, 2018
$
958

 
$
556

 
$
440

 
$
434

 
$
26,372

 
$
(42
)
 
$
7,903

 
$
36,621

Distributions to partners
(30
)
 
(18
)
 
(8
)
 
(8
)
 
(1,450
)
 

 

 
(1,514
)
Distributions to noncontrolling interest

 

 

 

 

 

 
(361
)
 
(361
)
Capital contributions from noncontrolling interest

 

 

 

 

 

 
140

 
140

Sale of noncontrolling interest in subsidiary

 

 

 

 

 

 
93

 
93

Other comprehensive income, net of tax

 

 

 

 

 
8

 

 
8

Other, net

 

 

 

 
15

 

 
13

 
28

Net income, excluding amounts attributable to redeemable noncontrolling interests
15

 
9

 
8

 
8

 
972

 

 
256

 
1,268

Balance, March 31, 2019
$
943

 
$
547

 
$
440

 
$
434

 
$
25,909

 
$
(34
)
 
$
8,044

 
$
36,283

 
Three Months Ended March 31, 2018
 
Limited Partners
 
 
 
 
 
 
 
 
 
 
 
Series A Preferred Unitholders
 
Series B Preferred Unitholders
 
Common Unitholders
 
General Partner
 
AOCI
 
Non-controlling Interest
 
Predecessor Equity
 
Total
Balance, December 31, 2017
$
944

 
$
547

 
$
26,531

 
$
244

 
$
3

 
$
5,882

 
$
2,816

 
$
36,967

Distributions to partners
(15
)
 
(9
)
 
(657
)
 
(264
)
 

 

 

 
(945
)
Distributions to noncontrolling interest

 

 

 

 

 
(183
)
 
(70
)
 
(253
)
Units issued for cash

 

 
20

 

 

 

 

 
20

Repurchases of common units

 

 
(24
)
 

 

 

 

 
(24
)
Subsidiary repurchases of common units

 

 

 

 

 

 
(300
)
 
(300
)
Capital contributions from noncontrolling interest

 

 

 

 

 
229

 

 
229

Cumulative effect adjustment due to change in accounting principle

 

 

 

 

 

 
(54
)
 
(54
)
Other comprehensive income, net of tax

 

 

 

 
1

 

 

 
1

Other, net
(1
)
 
(1
)
 
(16
)
 
(17
)
 
(2
)
 
(6
)
 
1

 
(42
)
Net income (loss)
15

 
9

 
289

 
402

 

 
164

 
(302
)
 
577

Balance, March 31, 2018
$
943

 
$
546

 
$
26,143

 
$
365

 
$
2

 
$
6,086

 
$
2,091

 
$
36,176


The accompanying notes are an integral part of these consolidated financial statements.
5

Table of Contents

ENERGY TRANSFER OPERATING, L.P. AND SUBSIDIARIES
CONSOLIDATED STATEMENTS OF CASH FLOWS
(Dollars in millions)
(unaudited)
 
Three Months Ended
March 31,
 
2019
 
2018
OPERATING ACTIVITIES
 
 
 
Net income
$
1,281

 
$
577

Reconciliation of net income to net cash provided by operating activities:
 
 
 
Loss from discontinued operations

 
237

Depreciation, depletion and amortization
771

 
661

Deferred income taxes
98

 
(11
)
Inventory valuation adjustments
(93
)
 
(25
)
Non-cash compensation expense
29

 
23

Impairment losses
50

 

Losses on extinguishments of debt
2

 
109

Distributions on unvested awards
(1
)
 
(16
)
Equity in earnings of unconsolidated affiliates
(65
)
 
(79
)
Distributions from unconsolidated affiliates
66

 
70

Other non-cash
107

 
(72
)
Net change in operating assets and liabilities, net of effects of acquisitions
(399
)
 
741

Net cash provided by operating activities
1,846

 
2,215

INVESTING ACTIVITIES
 
 
 
Cash proceeds from sale of noncontrolling interest in subsidiary
93

 

Cash paid for all other acquisitions
(5
)
 
(5
)
Capital expenditures, excluding allowance for equity funds used during construction
(1,150
)
 
(1,737
)
Contributions in aid of construction costs
15

 
20

Contributions to unconsolidated affiliates
(28
)
 
(8
)
Distributions from unconsolidated affiliates in excess of cumulative earnings
13

 
27

Proceeds from the sale of assets
4

 
3

Other
(40
)
 
(1
)
Net cash used in investing activities
(1,098
)
 
(1,701
)
FINANCING ACTIVITIES
 
 
 
Proceeds from borrowings
11,295

 
6,573

Repayments of debt
(9,513
)
 
(8,171
)
Cash paid for note receivable from related company
(613
)
 
(41
)
Common units issued for cash

 
20

Capital contributions from noncontrolling interest
140

 
229

Distributions to partners
(1,514
)
 
(945
)
Predecessor distributions to partners

 
(77
)
Distributions to noncontrolling interest
(361
)
 
(183
)
Repurchases of common units

 
(24
)
Subsidiary repurchases of common units

 
(300
)
Debt issuance costs
(84
)
 
(117
)
Other

 
(7
)
Net cash used in financing activities
(650
)
 
(3,043
)
DISCONTINUED OPERATIONS
 
 
 
Operating activities

 
(485
)
Investing activities

 
3,214

Changes in cash included in current assets held for sale

 
11

Net increase in cash and cash equivalents of discontinued operations

 
2,740

Increase in cash and cash equivalents
98

 
211

Cash and cash equivalents, beginning of period
418

 
335

Cash and cash equivalents, end of period
$
516

 
$
546


The accompanying notes are an integral part of these consolidated financial statements.
6

Table of Contents

ENERGY TRANSFER OPERATING, L.P. AND SUBSIDIARIES
NOTES TO CONSOLIDATED FINANCIAL STATEMENTS
(Tabular dollar and unit amounts are in millions)
(unaudited)
1.
ORGANIZATION AND BASIS OF PRESENTATION
Organization
The consolidated financial statements presented herein include Energy Transfer Operating, L.P. and its subsidiaries (the “Partnership,” “we,” “us,” “our” or “ETO”).
Energy Transfer Operating, L.P. is a consolidated subsidiary of Energy Transfer LP. In October 2018, we completed the merger of ETO with a wholly-owned subsidiary of ET in a unit-for-unit exchange (the “Energy Transfer Merger”). In connection with the transaction, ETO unitholders (other than ET and its subsidiaries) received 1.28 common units of ET for each common unit of ETO they owned. Following the closing of the Energy Transfer Merger, Energy Transfer Partners, L.P. was renamed Energy Transfer Operating, L.P. In addition, Energy Transfer Equity, L.P. was renamed Energy Transfer LP, and its common units began trading on the New York Stock Exchange under the “ET” ticker symbol on Friday, October 19, 2018.
Immediately prior to the closing of the Energy Transfer Merger, the following also occurred:
the IDRs in ETO were converted into 1,168,205,710 ETO common units;
the general partner interest in ETO was converted to a non-economic general partner interest and ETO issued 18,448,341 ETO common units to ETP GP;
ET contributed its 2,263,158 Sunoco LP common units to ETO in exchange for 2,874,275 ETO common units and 100 percent of the limited liability company interests in Sunoco GP LLC, the sole general partner of Sunoco LP, and all of the IDRs in Sunoco LP, to ETO in exchange for 42,812,389 ETO common units;
ET contributed its 12,466,912 common units representing limited partner interests in USAC and 100 percent of the limited liability company interests in USA Compression GP, LLC, the general partner of USAC, to ETO in exchange for 16,134,903 ETO common units; and
ET contributed its 100 percent limited liability company interest in Lake Charles LNG and a 60 percent limited liability company interest in each of Energy Transfer LNG Export, LLC, ET Crude Oil Terminals, LLC and ETC Illinois LLC (collectively, “Lake Charles LNG and Other”) to ETO in exchange for 37,557,815 ETO common units.
The Energy Transfer Merger was a combination of entities under common control; therefore, Sunoco LP, Lake Charles LNG and USAC’s assets and liabilities were not adjusted. The Partnership’s consolidated financial statements have been retrospectively adjusted to reflect consolidation beginning January 1, 2018 of Sunoco LP and Lake Charles LNG and Other and April 2, 2018 for USAC (the date ET acquired USAC). Predecessor equity included on the consolidated financial statements represents Sunoco LP, Lake Charles LNG and Other and USAC’s equity prior to the Energy Transfer Merger.
Our consolidated financial statements reflect the following reportable business segments:
intrastate transportation and storage;
interstate transportation and storage;
midstream;
NGL and refined products transportation and services;
crude oil transportation and services;
investment in Sunoco LP;
investment in USAC; and
all other.
Basis of Presentation
The unaudited financial information included in this Form 10-Q has been prepared on the same basis as the audited consolidated financial statements of Energy Transfer Operating, L.P. for the year ended December 31, 2018, included in the Partnership’s Annual Report on Form 10-K filed with the SEC on February 22, 2019. In the opinion of the Partnership’s management,


7

Table of Contents

such financial information reflects all adjustments necessary for a fair presentation of the financial position and the results of operations for such interim periods in accordance with GAAP. All intercompany items and transactions have been eliminated in consolidation. Certain information and footnote disclosures normally included in annual consolidated financial statements prepared in accordance with GAAP have been omitted pursuant to the rules and regulations of the SEC.
The consolidated financial statements of the Partnership presented herein include the results of operations of our controlled subsidiaries, including Sunoco LP and USAC.
For periods presented herein, certain balances have been reclassified to assets and liabilities held for sale and certain revenues and expenses to discontinued operations. Certain other prior period amounts have also been reclassified to conform to the current period presentation. These reclassifications had no impact on net income or total equity.
Use of Estimates
The unaudited consolidated financial statements have been prepared in conformity with GAAP, which includes the use of estimates and assumptions made by management that affect the reported amounts of assets, liabilities, revenues, expenses and disclosure of contingent assets and liabilities that exist at the date of the consolidated financial statements. Although these estimates are based on management’s available knowledge of current and expected future events, actual results could be different from those estimates.
Change in Accounting Policy
Adoption of Lease Accounting Standard
In February 2016, the Financial Accounting Standards Board (“FASB”) issued Accounting Standards Update (“ASU”) No. 2016-02, Leases (Topic 842), which has amended the FASB Accounting Standards Codification (“ASC”) and introduced Topic 842, Leases. On January 1, 2019, the Partnership has adopted ASC Topic 842 (“Topic 842”), which is effective for interim and annual reporting periods beginning on or after December 15, 2018. Topic 842 requires entities to recognize lease assets and liabilities on the balance sheet for all leases with a term of more than one year, including operating leases, which historically were not recorded on the balance sheet in accordance with the prior standard.
To adopt Topic 842, the Partnership recognized a cumulative catch-up adjustment to the opening balance sheet as of January 1, 2019 related to certain leases that existed as of that date. As permitted, we have not retrospectively modified our consolidated financial statements for comparative purposes. The adoption of the standard had a material impact on our consolidated balance sheet, but did not have an impact on our consolidated statements of operations, comprehensive income or cash flows. As a result of adoption, we have recorded additional net right-of-use (“ROU”) lease assets and lease liabilities of approximately $888 million and $888 million, respectively, as of January 1, 2019. In addition, we have updated our business processes, systems, and internal controls to support the on-going reporting requirements under the new standard.
To adopt Topic 842, the Partnership elected the package of practical expedients permitted under the transition guidance within the standard. The expedient package allowed us not to reassess whether existing contracts contained a lease, the lease classification of existing leases and initial direct cost for existing leases. In addition to the package of practical expedients, the Partnership has elected not to capitalize amounts pertaining to leases with terms less than twelve months, to use the portfolio approach to determine discount rates, not to separate non-lease components from lease components and not to apply the use of hindsight to the active lease population.


8

Table of Contents

Cumulative-effect adjustments made to the opening balance sheet at January 1, 2019 were as follows:
 
Balance at December 31, 2018, as previously reported
 
Adjustments due to Topic 842 (Leases)
 
Balance at January 1, 2019
Assets:
 
 
 
 
 
Property, plant and equipment, net
$
66,655

 
$
(1
)
 
$
66,654

Lease right-of-use assets, net

 
889

 
889

Liabilities:
 
 
 
 
 
Operating lease current liabilities
$

 
$
71

 
$
71

Accrued and other current liabilities
2,847

 
(1
)
 
2,846

Current maturities of long-term debt
2,655

 
1

 
2,656

Long-term debt, less current maturities
37,853

 
6

 
37,859

Non-current operating lease liabilities

 
823

 
823

Other non-current liabilities
1,184

 
(12
)
 
1,172

Additional disclosures related to lease accounting are included in Note 12.
Recent Accounting Pronouncements
ASU 2017-12
In August 2017, the FASB issued ASU No. 2017-12, Derivatives and Hedging (Topic 815): Targeted Improvements to Accounting for Hedging Activities. The amendments in this update improve the financial reporting of hedging relationships to better portray the economic results of an entity’s risk management activities in its financial statements. In addition, the amendments in this update make certain targeted improvements to simplify the application of the hedge accounting guidance in current GAAP. The Partnership adopted the new rules in the first quarter of 2019, and the adoption of the new accounting rules did not have a material impact on the consolidated financial statements and related disclosures.
2.
ACQUISITIONS, DIVESTURES AND RELATED TRANSACTIONS
Assets Held for Sale
Assets held for sale are written down to the lower of cost or estimated net realizable value at the time we offer them for sale. When we have determined that an asset is more likely than not to be sold in the next twelve months, that asset is classified as assets held for sale and included in other current assets.
As of March 31, 2019, the Partnership had $28 million classified as assets held for sale related to the pending sale of Sunoco LP’s ethanol plant in Fulton, New York. Based on the sale price of the pending sale, Sunoco LP wrote down the assets held for sale and recorded a $47 million impairment charge during the three months ended March 31, 2019.
Sunoco LP Retail Store and Real Estate Sales
On January 23, 2018, Sunoco LP completed the disposition of assets pursuant to the purchase agreement with 7-Eleven, Inc. (the “7-Eleven Transaction”). As a result of the 7-Eleven Transaction, previously eliminated wholesale motor fuel sales to Sunoco LP’s retail locations are reported as wholesale motor fuel sales to third parties. Also, the related accounts receivable from such sales are no longer eliminated from the Partnership’s consolidated balance sheets and are reported as accounts receivable.
In connection with the 7-Eleven Transaction, Sunoco LP entered into a Distributor Motor Fuel Agreement dated as of January 23, 2018, as amended (“Supply Agreement”), with 7-Eleven and SEI Fuel (collectively, “Distributor”). The Supply Agreement consists of a 15-year take-or-pay fuel supply arrangement. For the period from January 1, 2018 through January 22, 2018, Sunoco LP recorded sales to the sites that were subsequently sold to 7-Eleven of $199 million which were eliminated in consolidation. Sunoco LP received payments on trade receivables from 7-Eleven of $782 million for the three months ended March 31, 2019 and $612 million for the first quarter of 2018 subsequent to the closing of the sale.


9

Table of Contents

On January 18, 2017, with the assistance of a third-party brokerage firm, Sunoco LP launched a portfolio optimization plan to market and sell 97 real estate assets. Real estate assets included in this process are company-owned locations, undeveloped greenfield sites and other excess real estate. Properties are located in Florida, Louisiana, Massachusetts, Michigan, New Hampshire, New Jersey, New Mexico, New York, Ohio, Oklahoma, Pennsylvania, Rhode Island, South Carolina, Texas and Virginia. The properties are being sold through a sealed-bid. Of the 97 properties, 51 have been sold, one is under contract to be sold, and four continue to be marketed by the third-party brokerage firm. Additionally, 32 were sold to 7-Eleven and nine are part of the approximately 207 retail sites located in certain West Texas, Oklahoma and New Mexico markets which are operated by a commission agent.
The Partnership has concluded that it meets the accounting requirements for reporting the financial position, results of operations and cash flows of Sunoco LP’s retail divestment as discontinued operations.
There were no results of operations associated with discontinued operations for the period ended March 31, 2019. The results of operations associated with discontinued operations for the period ended March 31, 2018 were as follows:
 
Three Months Ended March 31, 2018
REVENUES
$
349

 
 
COSTS AND EXPENSES
 
Cost of products sold
305

Operating expenses
61

Selling, general and administrative
2

Total costs and expenses
368

OPERATING LOSS
(19
)
Interest expense, net
2

Loss on extinguishment of debt and other
20

Other, net
23

LOSS FROM DISCONTINUED OPERATIONS BEFORE INCOME TAX EXPENSE
(64
)
Income tax expense
173

LOSS FROM DISCONTINUED OPERATIONS, NET OF INCOME TAXES
$
(237
)
3.
CASH AND CASH EQUIVALENTS
Cash and cash equivalents include all cash on hand, demand deposits, and investments with original maturities of three months or less. We consider cash equivalents to include short-term, highly liquid investments that are readily convertible to known amounts of cash and that are subject to an insignificant risk of changes in value.
We place our cash deposits and temporary cash investments with high credit quality financial institutions. At times, our cash and cash equivalents may be uninsured or in deposit accounts that exceed the Federal Deposit Insurance Corporation insurance limit.


10

Table of Contents

The net change in operating assets and liabilities (net of effects of acquisitions) included in cash flows from operating activities is comprised as follows:
 
Three Months Ended
March 31,
 
2019
 
2018
Accounts receivable
$
(302
)
 
$
907

Accounts receivable from related companies
(28
)
 
103

Inventories
49

 
186

Other current assets
91

 
(46
)
Other non-current assets, net
(10
)
 
7

Accounts payable
323

 
(810
)
Accounts payable to related companies
(69
)
 
(125
)
Accrued and other current liabilities
(409
)
 
508

Other non-current liabilities
(31
)
 
20

Derivative assets and liabilities, net
(13
)
 
(9
)
Net change in operating assets and liabilities, net of effects of acquisitions
$
(399
)
 
$
741

Non-cash investing and financing activities are as follows:

Three Months Ended
March 31,

2019
 
2018
Accrued capital expenditures
$
630

 
$
1,011

Losses from subsidiary common unit transactions

 
(104
)
Lease assets obtained in exchange for new lease liabilities
8

 

4.
INVENTORIES
Inventories consisted of the following:
 
March 31, 2019
 
December 31, 2018
Natural gas, NGLs and refined products
$
760

 
$
833

Crude oil
589

 
506

Spare parts and other
373

 
338

Total inventories
$
1,722

 
$
1,677

We utilize commodity derivatives to manage price volatility associated with our natural gas inventory. Changes in fair value of designated hedged inventory are recorded in inventory on our consolidated balance sheets and cost of products sold in our consolidated statements of operations.
5.
FAIR VALUE MEASURES
Based on the estimated borrowing rates currently available to us and our subsidiaries for loans with similar terms and average maturities, the aggregate fair value and carrying amount of our consolidated debt obligations as of March 31, 2019 was $48.38 billion and $46.40 billion, respectively. As of December 31, 2018, the aggregate fair value and carrying amount of our consolidated debt obligations was $39.54 billion and $40.51 billion, respectively. The fair value of our consolidated debt obligations is a Level 2 valuation based on the observable inputs used for similar liabilities.
We have commodity derivatives and interest rate derivatives that are accounted for as assets and liabilities at fair value in our consolidated balance sheets. We determine the fair value of our assets and liabilities subject to fair value measurement by using the highest possible “level” of inputs. Level 1 inputs are observable quotes in an active market for identical assets and


11

Table of Contents

liabilities. We consider the valuation of marketable securities and commodity derivatives transacted through a clearing broker with a published price from the appropriate exchange as a Level 1 valuation. Level 2 inputs are inputs observable for similar assets and liabilities. We consider OTC commodity derivatives entered into directly with third parties as a Level 2 valuation since the values of these derivatives are quoted on an exchange for similar transactions. Additionally, we consider our options transacted through our clearing broker as having Level 2 inputs due to the level of activity of these contracts on the exchange in which they trade. We consider the valuation of our interest rate derivatives as Level 2 as the primary input, the LIBOR curve, is based on quotes from an active exchange of Eurodollar futures for the same period as the future interest swap settlements. Level 3 inputs are unobservable. During the three months ended March 31, 2019, no transfers were made between any levels within the fair value hierarchy.
The following tables summarize the gross fair value of our financial assets and liabilities measured and recorded at fair value on a recurring basis as of March 31, 2019 and December 31, 2018 based on inputs used to derive their fair values:
 
 
 
Fair Value Measurements at
March 31, 2019
 
Fair Value Total
 
Level 1
 
Level 2
Assets:
 
 
 
 
 
Commodity derivatives:
 
 
 
 
 
Natural Gas:
 
 
 
 
 
Basis Swaps IFERC/NYMEX
$
40

 
$
40

 
$

Swing Swaps IFERC
3

 
1

 
2

Fixed Swaps/Futures
16

 
16

 

Forward Physical Contracts
10

 

 
10

Power:
 
 
 
 
 
Forwards
44

 

 
44

Futures
7

 
7

 

NGLs – Forwards/Swaps
162

 
162

 

Refined Products – Futures
5

 
5

 

Crude – Forwards/Swaps
51

 
51

 

Total commodity derivatives
338

 
282

 
56

Other non-current assets
28

 
18

 
10

Total assets
$
366

 
$
300

 
$
66

Liabilities:
 
 
 
 
 
Interest rate derivatives
$
(232
)
 
$

 
$
(232
)
Commodity derivatives:
 
 
 
 
 
Natural Gas:
 
 
 
 
 
Basis Swaps IFERC/NYMEX
(81
)
 
(81
)
 

Swing Swaps IFERC
(4
)
 
(2
)
 
(2
)
Fixed Swaps/Futures
(18
)
 
(18
)
 

Forward Physical Contracts
(5
)
 

 
(5
)
Power:
 
 
 
 
 
Forwards
(35
)
 

 
(35
)
Futures
(6
)
 
(6
)
 

NGLs – Forwards/Swaps
(155
)
 
(155
)
 

Refined Products – Futures
(4
)
 
(4
)
 

Crude – Forwards/Swaps
(1
)
 
(1
)
 

Total commodity derivatives
(309
)
 
(267
)
 
(42
)
Total liabilities
$
(541
)
 
$
(267
)
 
$
(274
)


12

Table of Contents

 
 
 
Fair Value Measurements at
December 31, 2018
 
Fair Value Total
 
Level 1
 
Level 2
Assets:
 
 
 
 
 
Commodity derivatives:
 
 
 
 
 
Natural Gas:
 
 
 
 
 
Basis Swaps IFERC/NYMEX
$
42

 
$
42

 
$

Swing Swaps IFERC
52

 
8

 
44

Fixed Swaps/Futures
97

 
97

 

Forward Physical Contracts
20

 

 
20

Power:


 
 
 
 
Forwards
48

 

 
48

Futures
1

 
1

 

Options – Calls
1

 
1

 

NGLs – Forwards/Swaps
291

 
291

 

Refined Products – Futures
7

 
7

 

Crude – Forwards/Swaps
1

 
1

 

Total commodity derivatives
560

 
448

 
112

Other non-current assets
26

 
17

 
9

Total assets
$
586

 
$
465

 
$
121

Liabilities:
 
 
 
 
 
Interest rate derivatives
$
(163
)
 
$

 
$
(163
)
Commodity derivatives:
 
 
 
 
 
Natural Gas:
 
 
 
 
 
Basis Swaps IFERC/NYMEX
(91
)
 
(91
)
 

Swing Swaps IFERC
(40
)
 

 
(40
)
Fixed Swaps/Futures
(88
)
 
(88
)
 

Forward Physical Contracts
(21
)
 

 
(21
)
Power:


 
 
 
 
Forwards
(42
)
 

 
(42
)
Futures
(1
)
 
(1
)
 

NGLs – Forwards/Swaps
(224
)
 
(224
)
 

Refined Products – Futures
(15
)
 
(15
)
 

Crude – Forwards/Swaps
(61
)
 
(61
)
 

Total commodity derivatives
(583
)
 
(480
)
 
(103
)
Total liabilities
$
(746
)
 
$
(480
)
 
$
(266
)
6.
DEBT OBLIGATIONS
Notes and Debentures
ET-ETO Senior Notes Exchange
In February 2019, ETO commenced offers to exchange all of ET’s outstanding senior notes for senior notes issued by ETO (the “ET-ETO senior notes exchange”).  Approximately 97% of ET’s outstanding senior notes were tendered and accepted, and the exchanges settled on March 25, 2019. In connection with the exchange, ETO issued approximately $4.21 billion aggregate principal amount of the following senior notes:
$1.13 billion aggregate principal amount of 7.50% senior notes due 2020;
$993 million aggregate principal amount of 4.25% senior notes due 2023;


13

Table of Contents

$1.13 billion aggregate principal amount of 5.875% senior notes due 2024; and
$956 million aggregate principal amount of 5.50% senior notes due 2027.
The senior notes were registered under the Securities Act of 1933 (as amended).  The Partnership may redeem some or all of the senior notes at any time, or from time to time, pursuant to the terms of the indenture and related indenture supplements related to the senior notes. The principal on the senior notes is payable upon maturity and interest is paid semi-annually.
The senior notes rank equally in right of payment with ETO’s existing and future senior debt, and senior in right of payment to any future subordinated debt ETO may incur.  The notes of each series will initially be fully and unconditionally guaranteed by our subsidiary, Sunoco Logistics Partners Operations L.P., on a senior unsecured basis so long as it guarantees any of our other long-term debt. The guarantee for each series of notes ranks equally in right of payment with all of the existing and future senior debt of Sunoco Logistics Partners Operations L.P., including its senior notes.
ETO Senior Notes Offering and Redemption
In January 2019, ETO issued the following senior notes:
$750 million aggregate principal amount of 4.50% senior notes due 2024;
$1.50 billion aggregate principal amount of 5.25% senior notes due 2029; and
$1.75 billion aggregate principal amount of 6.25% senior notes due 2049.
The senior notes were registered under the Securities Act of 1933 (as amended).  The Partnership may redeem some or all of the senior notes at any time, or from time to time, pursuant to the terms of the indenture and related indenture supplements related to the senior notes. The principal on the senior notes is payable upon maturity and interest is paid semi-annually.
The senior notes rank equally in right of payment with ETO’s existing and future senior debt, and senior in right of payment to any future subordinated debt ETO may incur.  The notes of each series will initially be fully and unconditionally guaranteed by our subsidiary, Sunoco Logistics Partners Operations L.P., on a senior unsecured basis so long as it guarantees any of our other long-term debt. The guarantee for each series of notes ranks equally in right of payment with all of the existing and future senior debt of Sunoco Logistics Partners Operations L.P., including its senior notes.
The $3.96 billion net proceeds from the offering were used to make an intercompany loan to ET (which ET used to repay its term loan in full), for general partnership purposes and to redeem at maturity all of the following:
ETO’s $400 million aggregate principal amount of 9.70% senior notes due March 15, 2019;
ETO’s $450 million aggregate principal amount of 9.00% senior notes due April 15, 2019; and
Panhandle’s $150 million aggregate principal amount of 8.125% senior notes due June 1, 2019.
Bakken Senior Notes Offering
In March 2019, Midwest Connector Capital Company LLC, a wholly-owned subsidiary of Dakota Access, LLC, issued the following senior notes related to the Bakken pipeline:
$650 million aggregate principal amount of 3.625% senior notes due 2022;
$1.00 billion aggregate principal amount of 3.90% senior notes due 2024; and
$850 million aggregate principal amount of 4.625% senior notes due 2029.
The $2.48 billion in net proceeds from the offering were used to repay in full all amounts outstanding on the Bakken credit facility and the facility was terminated.
Sunoco LP Senior Notes Offering
In March 2019, Sunoco LP issued $600 million aggregate principal amount of 6.00% senior notes due 2027 in a private placement to eligible purchasers. The net proceeds from this offering were used to repay a portion of Sunoco LP’s existing borrowings under its credit facility.
USAC Senior Notes Offering
In March 2019, USAC issued $750 million aggregate principal amount of 6.875% senior unsecured notes due 2027 in a private placement to eligible purchasers. The net proceeds from this offering were used to repay a portion of USAC’s existing


14

Table of Contents

borrowings under its credit facility and for general partnership purposes.
Credit Facilities and Commercial Paper
ETO Five-Year Credit Facility
ETO’s revolving credit facility (the “ETO Five-Year Credit Facility”) allows for unsecured borrowings up to $5.00 billion and matures on December 1, 2023. The ETO Five-Year Credit Facility contains an accordion feature, under which the total aggregate commitment may be increased up to $6.00 billion under certain conditions.
As of March 31, 2019, the ETO Five-Year Credit Facility had $1.76 billion of outstanding borrowings, all of which was commercial paper. The amount available for future borrowings was $3.15 billion after taking into account letters of credit of $89 million. The weighted average interest rate on the total amount outstanding as of March 31, 2019 was 3.17%.
ETO 364-Day Facility
ETO’s 364-day revolving credit facility (the “ETO 364-Day Facility”) allows for unsecured borrowings up to $1.00 billion and matures on November 29, 2019. As of March 31, 2019, the ETO 364-Day Facility had no outstanding borrowings.
Sunoco LP Credit Facility
Sunoco LP maintains a $1.50 billion revolving credit facility (the “Sunoco LP Credit Facility”), which matures in July 2023. As of March 31, 2019, the Sunoco LP Credit Facility had $150 million of outstanding borrowings and $8 million in standby letters of credit. As of March 31, 2019, Sunoco LP had $1.34 billion of availability under the Sunoco LP Credit Facility. The weighted average interest rate on the total amount outstanding as of March 31, 2019 was 4.49%.
USAC Credit Facility
USAC maintains a $1.60 billion revolving credit facility (the “USAC Credit Facility”), which matures in April 2023. As of March 31, 2019, the USAC Credit Facility had $361 million of outstanding borrowings and no outstanding letters of credit. As of March 31, 2019, USAC had $1.24 billion of borrowing base availability and, subject to compliance with the applicable financial covenants, available borrowing capacity of $493 million under the USAC Credit Facility. The weighted average interest rate on the total amount outstanding as of March 31, 2019 was 5.17%.
Compliance with Our Covenants
We were in compliance with all requirements, tests, limitations, and covenants related to our credit agreements as of March 31, 2019.
7.
REDEEMABLE NONCONTROLLING INTERESTS
Certain redeemable noncontrolling interests in the Partnership’s subsidiaries are reflected as mezzanine equity on the consolidated balance sheets. Redeemable noncontrolling interests as of March 31, 2019 included (i) $477 million related to the USAC Preferred Units described below and (ii) $22 million related to noncontrolling interest holders in one of the Partnership’s consolidated subsidiaries that have the option to sell their interests to the Partnership.
USAC Preferred Units
In 2018, USAC issued 500,000 USAC Preferred Units at a price of $1,000 per USAC Preferred Unit, for total gross proceeds of $500 million in a private placement.
The USAC Preferred Units are entitled to receive cumulative quarterly distributions equal to $24.375 per USAC Preferred Unit, subject to increase in certain limited circumstances. The USAC Preferred Units will have a perpetual term, unless converted or redeemed.
8.
EQUITY
As of March 31, 2019, all of our outstanding common units are owned by ET.


15

Table of Contents

Preferred Units
As of each of March 31, 2019 and December 31, 2018, ETO’s preferred units outstanding were as follows:
 
Series A
 
Series B
 
Series C
 
Series D
Number of units outstanding
950,000

 
550,000

 
18,000,000

 
17,800,000

Series E Preferred Units Issuance
In April 2019, ETO issued 32 million of its 7.600% Series E Preferred Units at a price of $25 per unit, including 4 million Series E Preferred Units pursuant to the underwriters’ exercise of their option to purchase additional preferred units. The total gross proceeds from the Series E Preferred Unit issuance were $800 million, including $100 million from the underwriters’ exercise of their option. The net proceeds were used to repay amounts outstanding under ETO’s revolving credit facility and for general partnership purposes.
Distributions on the Series E Preferred Units will accrue and be cumulative from and including the date of original issue to, but excluding, May 15, 2024, at a rate of 7.600% per annum of the stated liquidation preference of $25. On and after May 15, 2024, distributions on the Series E Preferred Units will accumulate at a percentage of the $25 liquidation preference equal to an annual floating rate of the three-month LIBOR, determined quarterly, plus a spread of 5.161% per annum. The Series E Preferred Units are redeemable at ETO’s option on or after May 15, 2024 at a redemption price of $25 per Series E Preferred Unit, plus an amount equal to all accumulated and unpaid distributions thereon to, but excluding, the date of redemption.
Subsidiary Equity Transactions
Sunoco LP Equity Distribution Program
For the three months ended March 31, 2019, Sunoco LP issued no additional units under its at-the-market equity distribution program. As of March 31, 2019, $295 million of Sunoco LP common units remained available to be issued under the currently effective equity distribution agreement.
USAC Distribution Reinvestment Program
During the three months ended March 31, 2019, distributions of $0.3 million were reinvested under the USAC distribution reinvestment program resulting in the issuance of approximately 16,714 USAC common units.
Cash Distributions
Distributions on ETO’s preferred units declared and paid by the Partnership subsequent to December 31, 2018 were as follows:
Period Ended
 
Record Date
 
Payment Date
 
Series A (1)
 
Series B (1)
 
Series C
 
Series D
December 31, 2018
 
February 1, 2019
 
February 15, 2019
 
$
31.25

 
$
33.125

 
$
0.4609

 
$
0.4766

March 31, 2019
 
May 1, 2019
 
May 15, 2019
 

 

 
0.4609

 
0.4766

(1)    Series A and Series B preferred unit distributions are paid on a semi-annual basis.
Sunoco LP Cash Distributions
The following are distributions declared and paid by Sunoco LP subsequent to December 31, 2018:
Quarter Ended
 
Record Date
 
Payment Date
 
Rate
December 31, 2018
 
February 6, 2019
 
February 14, 2019
 
$
0.8255

March 31, 2019
 
May 7, 2019
 
May 15, 2019
 
0.8255



16

Table of Contents

USAC Cash Distributions
The following are distributions declared and paid by USAC subsequent to December 31, 2018:
Quarter Ended
 
Record Date
 
Payment Date
 
Rate
December 31, 2018
 
January 28, 2019
 
February 8, 2019
 
$
0.5250

March 31, 2019
 
April 29, 2019
 
May 10, 2019
 
0.5250

Accumulated Other Comprehensive Income (Loss)
The following table presents the components of AOCI, net of tax:
 
March 31, 2019
 
December 31, 2018
Available-for-sale securities
$
7

 
$
2

Foreign currency translation adjustment
(5
)
 
(5
)
Actuarial loss related to pensions and other postretirement benefits
(41
)
 
(48
)
Investments in unconsolidated affiliates, net
5

 
9

Total AOCI, net of tax
$
(34
)
 
$
(42
)
9.
INCOME TAXES
The Partnership’s effective tax rate differs from the statutory rate primarily due to partnership earnings that are not subject to United States federal and most state income taxes at the partnership level. For the three months ended March 31, 2019, the Partnership’s effective tax rate was primarily driven by an increase in income before tax expense (benefit) at our corporate subsidiaries.
ETC Sunoco Holdings LLC (“Sunoco, Inc.”) historically included certain government incentive payments as taxable income on its federal and state income tax returns.  In connection with Sunoco, Inc.'s 2004 through 2011 years, Sunoco, Inc. filed amended returns with the IRS excluding these government incentive payments from federal taxable income.  The IRS denied the amended returns, and Sunoco, Inc. petitioned the Court of Federal Claims ("CFC") in June 2015 on this issue for the 2004 through 2009 tax years.  Sunoco, Inc.'s 2010 and 2011 years are extended for this issue with the Internal Revenue Service ("IRS"). In November 2016, the CFC ruled against Sunoco, Inc., and the United States Court of Appeals for the Federal Circuit (the "Federal Circuit") affirmed the CFC's ruling on November 1, 2018.  Sunoco, Inc. subsequently filed a petition for rehearing with the Federal Circuit, and this was denied on January 24, 2019.  Sunoco, Inc. has until May 24, 2019 to file a petition for writ of certiorari to review the Federal Circuit's affirmation of the CFC's ruling.  If Sunoco, Inc. is ultimately fully successful in this litigation, it will receive tax refunds of approximately $530 million. However, due to the uncertainty surrounding the litigation, a reserve of $530 million was established for the full amount of the litigation. Due to the timing of the litigation and the related reserve, the receivable and the reserve for this issue have been netted in the balance sheets as of March 31, 2019 and December 31, 2018.
10.
REGULATORY MATTERS, COMMITMENTS, CONTINGENCIES AND ENVIRONMENTAL LIABILITIES
FERC Proceedings
By order issued January 16, 2019, the FERC initiated a review of Panhandle’s existing rates pursuant to Section 5 of the Natural Gas Act to determine whether the rates currently charged by Panhandle are just and reasonable and set the matter for hearing.  Panhandle filed a cost and revenue study on April 1, 2019.  An initial decision is expected to be issued in the first quarter of 2020. In addition, on November 30, 2018, Sea Robin filed a rate case pursuant to Section 4 of the Natural Gas Act.  A hearing date is scheduled for October 23, 2019 and an initial decision is expected to be issued in the first quarter of 2020.
By order issued February 19, 2019, the FERC initiated a review of Southwest Gas Storage Company’s existing rates pursuant to Section 5 of the Natural Gas Act to determine whether the rates currently charged by Southwest Gas Storage Company are just and reasonable and set the matter for hearing.  Southwest Gas Storage Company filed a cost and revenue study on May 6, 2019.  An initial decision is expected to be issued in the first quarter of 2020.


17

Table of Contents

Commitments
In the normal course of business, ETO purchases, processes and sells natural gas pursuant to long-term contracts and enters into long-term transportation and storage agreements. Such contracts contain terms that are customary in the industry. ETO believes that the terms of these agreements are commercially reasonable and will not have a material adverse effect on its financial position or results of operations.
Our joint venture agreements require that we fund our proportionate share of capital contributions to our unconsolidated affiliates. Such contributions will depend upon our unconsolidated affiliates’ capital requirements, such as for funding capital projects or repayment of long-term obligations.
We have certain non-cancelable right-of-way (“ROW”) commitments, which require fixed payments and either expire upon our chosen abandonment or at various dates in the future. The table below reflects ROW expense included in operating expenses in the accompanying statements of operations:
 
Three Months Ended
March 31,
 
2019
 
2018
ROW expense
$
6

 
$
6

Litigation and Contingencies
We may, from time to time, be involved in litigation and claims arising out of our operations in the normal course of business. Natural gas and crude oil are flammable and combustible. Serious personal injury and significant property damage can arise in connection with their transportation, storage or use. In the ordinary course of business, we are sometimes threatened with or named as a defendant in various lawsuits seeking actual and punitive damages for product liability, personal injury and property damage. We maintain liability insurance with insurers in amounts and with coverage and deductibles management believes are reasonable and prudent, and which are generally accepted in the industry. However, there can be no assurance that the levels of insurance protection currently in effect will continue to be available at reasonable prices or that such levels will remain adequate to protect us from material expenses related to product liability, personal injury or property damage in the future.
Dakota Access Pipeline
On July 25, 2016, the United States Army Corps of Engineers (“USACE”) issued permits to Dakota Access, LLC (“Dakota Access”) to make two crossings of the Missouri River in North Dakota. The USACE also issued easements to allow the pipeline to cross land owned by the USACE adjacent to the Missouri River. On July 27, 2016, the Standing Rock Sioux Tribe (“SRST”) filed a lawsuit in the United States District Court for the District of Columbia (“the Court”) against the USACE and challenged the legality of these permits and claimed violations of the National Historic Preservation Act (“NHPA”). SRST also sought a preliminary injunction to rescind the USACE permits while the case was pending, which the court denied on September 9, 2016. Dakota Access intervened in the case. The Cheyenne River Sioux Tribe (“CRST”) also intervened. SRST filed an amended complaint and added claims based on treaties between SRST and CRST and the United States and statutes governing the use of government property.
In February 2017, in response to a Presidential memorandum, the Department of the Army delivered an easement to Dakota Access allowing the pipeline to cross Lake Oahe. CRST moved for a preliminary injunction and temporary restraining order (“TRO”) to block operation of the pipeline, which motion was denied, and raised claims based on the religious rights of CRST.
In June 2017, SRST and CRST amended their complaints to incorporate religious freedom and other claims. In addition, the Oglala Sioux and Yankton Sioux tribes (collectively, “Tribes”) have filed related lawsuits to prevent construction of the Dakota Access pipeline project. These lawsuits have been consolidated into the action initiated by SRST. Several individual members of the Tribes have also intervened in the lawsuit asserting claims that overlap with those brought by the four Tribes.
On June 14, 2017, the Court ruled on SRST’s and CRST’s motions for partial summary judgment and the USACE’s cross-motions for partial summary judgment. The Court concluded that the USACE had not violated trust duties owed to the Tribes and had generally complied with its obligations under the Clean Water Act, the Rivers and Harbors Act, the Mineral Leasing Act, the National Environmental Policy Act (“NEPA”) and other related statutes; however, the Court remanded to the USACE three discrete issues for further analysis and explanation of its prior determinations under certain of these statutes.


18

Table of Contents

In November 2017, the Yankton Sioux Tribe (“YST”), moved for partial summary judgment asserting claims similar to those already litigated and decided by the Court in its June 14, 2017 decision on similar motions by CRST and SRST. YST argues that the USACE and Fish and Wildlife Service violated NEPA, the Mineral Leasing Act, the Rivers and Harbors Act, and YST’s treaty and trust rights when the government granted the permits and easements necessary for the pipeline.
On December 4, 2017, the Court imposed three conditions on continued operation of the pipeline during the remand process. First, Dakota Access must retain an independent third party to review its compliance with the conditions and regulations governing its easements and to assess integrity threats to the pipeline. The assessment report was filed with the Court. Second, the Court directed Dakota Access to continue its work with the Tribes and the USACE to revise and finalize its emergency spill response planning for the section of the pipeline crossing Lake Oahe. Dakota Access filed the revised plan with the Court. And third, the Court directed Dakota Access to submit bi-monthly reports during the remand period disclosing certain inspection and maintenance information related to the segment of the pipeline running between the valves on either side of the Lake Oahe crossing. The first and second reports were filed with the court on December 29, 2017 and February 28, 2018, respectfully.
On February 8, 2018, the Court docketed a motion by CRST to “compel meaningful consultation on remand.” SRST then made a similar motion for “clarification re remand process and remand conditions.” The motions sought an order from the Court directing the USACE as to how it should conduct its additional review on remand. Dakota Access and the USACE opposed both motions. On April 16, 2018, the Court denied both motions.
On March 19, 2018, the District Court denied YST’s motion for partial summary judgment and instead granted judgment in favor of Dakota Access pipeline and the USACE on the claims raised in YST’s motion. The Court concluded that YST’s NHPA claims are moot because construction of the pipeline is complete and that the government’s review process did not violate NEPA or the various treaties cited by the YST.
On May 3, 2018, the District Court ordered the USACE to file a status report by June 8, 2018 informing the Court when the USACE expects the remand process to be complete. On June 8, 2018, the USACE filed a status report stating that they would conclude the remand process by August 10, 2018. On August 7, 2018, the USACE informed the Court that they would need until August 31, 2018 to finish the remand process. On August 31, 2018, the USACE informed the Court that it had completed the remand process and that it had determined that the three issues remanded by the Court had been correctly decided. On October 1, 2018, the USACE produced a detailed remand analysis document supporting that determination. The Tribes and certain of the individuals sought leave of the Court to amend their complaints to challenge the remand process and the USACE’s decision on remand.
On January 3, 2019, the Court granted the Tribes’ requests to supplement their respective complaints challenging the remand process, subject to defendants’ right to argue later that such supplementation may be overbroad and not permitted by law. On January 10, 2019, the Court denied the Oglala Sioux Tribe’s motion to amend its complaint to expand one of its pre-remand claims.
On January 17, 2019, the DOJ, on behalf of the USACE, moved to stay the litigation in light of the lapse in appropriations for the DOJ. The Tribes and individual plaintiffs opposed that request. On January 28, 2019, the USACE moved to withdraw this motion because appropriations for the DOJ had been restored. The Court granted this motion the next day.
On January 31, 2019, the USACE notified the Court that it had provided the administrative record for the remand to all parties. On February 27, 2019, the four Tribes filed a joint motion challenging the completeness of the record. The USACE opposed this motion in part, and Dakota Access opposed in full. The Tribes filed their reply brief on March 18, 2019 and the motion is now fully briefed and before the Court.
On May 8, 2019, the Court issued an order on Plaintiffs’ motion to complete the administrative record, requiring the parties to submit additional information so that the Court can determine what documents, if any, should be added to the record. The Court’s previous orders require that the parties must file a joint proposed schedule for the final round of summary judgment briefing within seven days of a final order on the challenges to the record.
While Energy Transfer believes that the pending lawsuits are unlikely to halt or suspend operation of the pipeline, we cannot assure this outcome. Energy Transfer cannot determine when or how these lawsuits will be resolved or the impact they may have on the Dakota Access project.
Mont Belvieu Incident
On June 26, 2016, a hydrocarbon storage well located on another operator’s facility adjacent to Lone Star NGL Mont Belvieu’s (“Lone Star”) facilities in Mont Belvieu, Texas experienced an over-pressurization resulting in a subsurface release. The


19

Table of Contents

subsurface release caused a fire at Lone Star’s South Terminal and damage to Lone Star’s storage well operations at its South and North Terminals. Normal operations have resumed at the facilities with the exception of one of Lone Star’s storage wells. Lone Star is still quantifying the extent of its incurred and ongoing damages and has obtained, and will continue to seek, reimbursement for these losses.
MTBE Litigation
Sunoco, Inc. and Sunoco, Inc. (R&M) (now known as Sunoco (R&M), LLC) (collectively, “Sunoco”) are defendants in lawsuits alleging MTBE contamination of groundwater. The plaintiffs, state-level governmental entities, assert product liability, nuisance, trespass, negligence, violation of environmental laws, and/or deceptive business practices claims. The plaintiffs seek to recover compensatory damages, and in some cases also seek natural resource damages, injunctive relief, punitive damages, and attorneys’ fees.
As of March 31, 2019, Sunoco is a defendant in five cases, including one case each initiated by the States of Maryland and Rhode Island, one by the Commonwealth of Pennsylvania and two by the Commonwealth of Puerto Rico. The more recent Puerto Rico action is a companion case alleging damages for additional sites beyond those at issue in the initial Puerto Rico action. The actions brought by the State of Maryland and Commonwealth of Pennsylvania have also named as defendants Energy Transfer Partners, L.P., ETP Holdco Corporation, and Sunoco Partners Marketing & Terminals, L.P. (“SPMT”).
It is reasonably possible that a loss may be realized in the remaining cases; however, we are unable to estimate the possible loss or range of loss in excess of amounts accrued. An adverse determination with respect to one or more of the MTBE cases could have a significant impact on results of operations during the period in which any such adverse determination occurs, but such an adverse determination likely would not have a material adverse effect on the Partnership’s consolidated financial position.
Regency Merger Litigation
Purported Regency unitholders filed lawsuits in state and federal courts in Dallas and Delaware asserting claims relating to the Regency-ETO merger (the “Regency Merger”). All but one Regency Merger-related lawsuits have been dismissed. On June 10, 2015, Adrian Dieckman (“Dieckman”), a purported Regency unitholder, filed a class action complaint in the Court of Chancery of the State of Delaware (the “Regency Merger Litigation”), on behalf of Regency’s common unitholders against Regency GP, LP; Regency GP LLC; ET, ETO, ETP GP, and the members of Regency’s board of directors (“Defendants”).
The Regency Merger Litigation alleges that the Regency Merger breached the Regency partnership agreement because Regency’s conflicts committee was not properly formed, and the Regency Merger was not approved in good faith. On March 29, 2016, the Delaware Court of Chancery granted Defendants’ motion to dismiss the lawsuit in its entirety. Dieckman appealed. On January 20, 2017, the Delaware Supreme Court reversed the judgment of the Court of Chancery. On May 5, 2017, Plaintiff filed an Amended Verified Class Action Complaint. Defendants then filed Motions to Dismiss the Amended Complaint and a Motion to Stay Discovery on May 19, 2017. On February 20, 2018, the Court of Chancery issued an Order granting in part and denying in part the motions to dismiss, dismissing the claims against all defendants other than Regency GP, LP and Regency GP LLC (the “Regency Defendants”). On March 6, 2018, the Regency Defendants filed their Answer to Plaintiff’s Verified Amended Class Action Complaint. Trial is currently set for September 23-27, 2019.
The Regency Defendants cannot predict the outcome of the Regency Merger Litigation or any lawsuits that might be filed subsequent to the date of this filing; nor can the Regency Defendants predict the amount of time and expense that will be required to resolve the Regency Merger Litigation. The Regency Defendants believe the Regency Merger Litigation is without merit and intend to vigorously defend against it and any others that may be filed in connection with the Regency Merger.
Enterprise Products Partners, L.P. and Enterprise Products Operating LLC Litigation
On January 27, 2014, a trial commenced between ETO against Enterprise Products Partners, L.P. and Enterprise Products Operating LLC (collectively, “Enterprise”) and Enbridge (US) Inc.  Trial resulted in a verdict in favor of ETO against Enterprise that consisted of $319 million in compensatory damages and $595 million in disgorgement to ETO.  The jury also found that ETO owed Enterprise $1 million under a reimbursement agreement.  On July 29, 2014, the trial court entered a final judgment in favor of ETO and awarded ETO $536 million, consisting of compensatory damages, disgorgement, and pre-judgment interest.  The trial court also ordered that ETO shall be entitled to recover post-judgment interest and costs of court and that Enterprise is not entitled to any net recovery on its counterclaims.  Enterprise filed a notice of appeal with the Court of Appeals. On July 18, 2017, the Court of Appeals issued its opinion and reversed the trial court’s judgment. ETO’s motion for rehearing to the Court of Appeals was denied. On June 8, 2018, the Texas Supreme Court ordered briefing on the merits. ETO’s petition for review remains under consideration by the Texas Supreme Court.


20

Table of Contents

Rover
On November 3, 2017, the State of Ohio and the Ohio Environmental Protection Agency (“Ohio EPA”) filed suit against Rover and Pretec Directional Drilling, LLC (“Pretec”) seeking to recover approximately $2.6 million in civil penalties allegedly owed and certain injunctive relief related to permit compliance. Laney Directional Drilling Co., Atlas Trenchless, LLC, Mears Group, Inc., D&G Directional Drilling, Inc. d/b/a D&G Directional Drilling, LLC, and B&T Directional Drilling, Inc. (collectively, with Rover and Pretec, “Defendants”) were added as defendants on April 17, 2018 and July 18, 2018.
Ohio EPA alleges that the Defendants illegally discharged millions of gallons of drilling fluids into Ohio’s waters that caused pollution and degraded water quality, and that the Defendants harmed pristine wetlands in Stark County. Ohio EPA further alleges that the Defendants caused the degradation of Ohio’s waters by discharging pollution in the form of sediment-laden storm water into Ohio’s waters and that Rover violated its hydrostatic permits by discharging effluent with greater levels of pollutants than those permits allowed and by not properly sampling or monitoring effluent for required parameters or reporting those alleged violations. Rover and other Defendants filed several motions to dismiss and Ohio EPA filed a motion in opposition. The State’s opposition to those motions was filed on October 12, 2018. Rover and other Defendants filed their replies on November 2, 2018. On March 13, 2019, the court granted Rover and the other Defendants’ motion to dismiss on all counts. On April 10, 2019, the Ohio EPA filed a notice of appeal.
In January 2018, Ohio EPA sent a letter to the FERC to express concern regarding drilling fluids lost down a hole during horizontal directional drilling (“HDD”) operations as part of the Rover Pipeline construction. Rover sent a January 24, 2018 response to the FERC and stated, among other things, that as Ohio EPA conceded, Rover was conducting its drilling operations in accordance with specified procedures that had been approved by the FERC and reviewed by the Ohio EPA. In addition, although the HDD operations were crossing the same resource as that which led to an inadvertent release of drilling fluids in April 2017, the drill in 2018 had been redesigned since the original crossing. Ohio EPA expressed concern that the drilling fluids could deprive organisms in the wetland of oxygen. Rover, however, has now fully remediated the site, a fact with which Ohio EPA concurs. Construction of Rover is now complete and the pipeline is fully operational.
Bayou Bridge
On January 11, 2018, environmental groups and a trade association filed suit against the USACE in the United States District Court for the Middle District of Louisiana. Plaintiffs allege that the USACE’s issuance of permits authorizing the construction of the Bayou Bridge Pipeline through the Atchafalaya Basin (“Basin”) violated the National Environmental Policy Act, the Clean Water Act, and the Rivers and Harbors Act. They asked the district court to vacate these permits and to enjoin construction of the project through the Basin until the USACE corrects alleged deficiencies in its decision-making process. ETO, through its subsidiary Bayou Bridge Pipeline, LLC (“Bayou Bridge”), intervened on January 26, 2018. On March 27, 2018, Bayou Bridge filed an answer to the complaint.
On January 29, 2018, Plaintiffs filed motions for a preliminary injunction and TRO. United States District Court Judge Shelly Dick denied the TRO on January 30, 2018, but subsequently granted the preliminary injunction on February 23, 2018. On February 26, 2018, Bayou Bridge filed a notice of appeal and a motion to stay the February 23, 2018 preliminary injunction order. On February 27, 2018, Judge Dick issued an opinion that clarified her February 23, 2018 preliminary injunction order and denied Bayou Bridge’s February 26, 2018 motion to stay as moot. On March 1, 2018, Bayou Bridge filed a new notice of appeal and motion to stay the February 27, 2018 preliminary injunction order in the district court. On March 5, 2018, the district court denied the March 1, 2018 motion to stay the February 27, 2018 order.
On March 2, 2018, Bayou Bridge filed a motion to stay the preliminary injunction in the Fifth Circuit. On March 15, 2018, the Fifth Circuit granted a stay of injunction pending appeal and found that Bayou Bridge “is likely to succeed on the merits of its claim that the district court abused its discretion in granting a preliminary injunction.” Oral arguments were heard on the merits of the appeal, that is, whether the district court erred in granting the preliminary injunction in the Fifth Circuit on April 30, 2018. The district court has stayed the merits case pending decision of the Fifth Circuit. On May 10, 2018, the District Court stayed the litigation pending a decision from the Fifth Circuit. On July 6, 2018, the Fifth Circuit vacated the Preliminary Injunction and remanded the case back to the District Court. Construction is ongoing.
On August 14, 2018, Plaintiffs sought leave of court to amend their complaint to add an “as applied” challenge to the USACE’s application of the Louisiana Rapid Assessment Method to Bayou Bridge’s permits. Defendants’ filed motions in opposition on September 18, 2018. On September 18, 2018, Plaintiffs filed a motion for partial summary judgment on the issue of the USACE’s analysis of the risks of an oil spill once the pipeline is in operation. On November 6, 2018 the court struck plaintiffs’ motion as premature.
At an October 2, 2018 scheduling conference, the USACE agreed to lodge the administrative record for Plaintiffs’ original complaint, which it has done. Challenges to the completeness of the record have been briefed and are currently pending


21

Table of Contents

before the Court. At the October 18 conference, the Court also scheduled summary judgment briefing on Plaintiffs’ original complaint; briefing is scheduled to conclude by the Spring of 2019.
On December 28, 2018, Judge Dick issued a General Order for the Middle District of Louisiana holding in abeyance all civil matters where the United States is a party. Notwithstanding the General Order, on January 11, 2019, Plaintiffs filed a Motion for Summary Judgment on their National Environmental Policy Act and Clean Waters Act claims.
On January 11, 2019, Plaintiffs attempted to file a Motion for Summary Judgment on its National Environmental Policy Act and Coastal Water Authority claims. On January 23, 2019, Plaintiffs filed a Second Motion for Preliminary Injunction based on alleged permit violations, which the Court later denied. On February 11, 2019, the Court denied Plaintiffs’ August 14, 2018 motion for leave to amend their complaint.
On February 14, 2019, Judge Dick ordered that all summary judgment briefing is stayed until the Court rules on the motions challenging the completeness of the administrative record. Judge Dick further ordered that once those motions are decided, the parties will be allowed to update any summary judgment briefs they have already filed, if necessary, and that the Court will set new briefing deadlines.
On April 26, 2019, Plaintiffs filed a motion seeking reconsideration of Judge Dick’s February 14, 2019 order staying summary judgment briefing. Defendants filed their oppositions on May 6, 2019.
Revolution
On September 10, 2018, a pipeline release and fire (the “Incident”) occurred on the Revolution pipeline, a natural gas gathering line, in the vicinity of Ivy Lane located in Center Township, Beaver County, Pennsylvania. There were no injuries, but there were evacuations of local residents as a precautionary measure. The Pennsylvania Department of Environmental Protection (“PADEP”) and the Pennsylvania Public Utility Commission (“PUC”) are investigating the incident. On October 29, 2018, PADEP issued a Compliance Order requiring our subsidiary, ETC Northeast Pipeline, LLC (“ETC Northeast”), to cease all earth disturbance activities at the site (except as necessary to repair and maintain existing Best Management Practices (“BMPs”) and temporarily stabilize disturbed areas), implement and/or maintain the Erosion and Sediment BMPs at the site, stake the limit of disturbance, identify and report all areas of non-compliance, and submit an updated Erosion and Sediment Control Plan, a Temporary Stabilization Plan, and an updated Post Construction Stormwater Management Plan. The scope of the Compliance Order has been expanded to include the disclosure to PADEP of alleged violations of environmental permits with respect to various construction and post-construction activities and restoration obligations along the 42-mile route of the Revolution line. ETC Northeast filed an appeal of the Compliance Order with the Pennsylvania Environmental Hearing Board.
On February 8, 2019, PADEP filed a Petition to Enforce the Compliance Order with Pennsylvania’s Commonwealth Court. The Court issued an Order on February 14, 2019 requiring the submission of an answer to the Petition on or before March 12, 2019, and scheduled a hearing on the Petition for March 26, 2019.  On March 12, 2019, ETC Northeast answered the Petition.  ETC Northeast and PADEP have since agreed to a Stipulated Order regarding the issues raised in the Compliance Order, which obviated the need for a hearing. The Commonwealth Court approved the Stipulated Order on March 26, 2019.  On February 8, 2019, PADEP also issued a Permit Hold on any requests for approvals/permits or permit amendments made by us or any of our subsidiaries for any projects in Pennsylvania pursuant to the state’s water laws. The Partnership filed an appeal of the Permit Hold with the Pennsylvania Environmental Hearing Board on March 11, 2019. The Partnership continues to work through these issues with PADEP.
Chester County, Pennsylvania Investigation
In December 2018, the Chester County District Attorney (“Chester County D.A.”) sent a letter to the Partnership stating that it was investigating the Partnership and related entities for “potential crimes” related to the Mariner East pipelines.
On April 11, 2019, the Partnership was served with twenty-two grand jury subpoenas seeking a variety of documents and records sought by the Chester County Investigation Grand Jury. While the Partnership intends to cooperate with the investigation, we intend to vigorously defend ourselves against these allegations.
Delaware County, Pennsylvania Investigation
On March 11, 2019, the Delaware County District Attorney’s Office (“Delaware County D.A.”) announced that the Delaware County D.A. and the Pennsylvania Attorney General’s Office (“Pennsylvania A.G.”), at the request of the Delaware County D.A., are conducting an investigation of alleged criminal misconduct involving the construction and related activities of the Mariner East pipelines in Delaware County. There are neither specifics with regard to who has made the allegations of criminal


22

Table of Contents

misconduct nor specifics of any such conduct. While the Partnership intends to cooperate with the investigation, we intend to vigorously defend ourselves against these allegations.
Other Litigation and Contingencies
We or our subsidiaries are a party to various legal proceedings and/or regulatory proceedings incidental to our businesses. For each of these matters, we evaluate the merits of the case, our exposure to the matter, possible legal or settlement strategies, the likelihood of an unfavorable outcome and the availability of insurance coverage. If we determine that an unfavorable outcome of a particular matter is probable and can be estimated, we accrue the contingent obligation, as well as any expected insurance recoverable amounts related to the contingency. As of March 31, 2019 and December 31, 2018, accruals of approximately $42 million and $53 million, respectively, were reflected on our consolidated balance sheets related to these contingent obligations. As new information becomes available, our estimates may change. The impact of these changes may have a significant effect on our results of operations in a single period.
The outcome of these matters cannot be predicted with certainty and there can be no assurance that the outcome of a particular matter will not result in the payment of amounts that have not been accrued for the matter. Furthermore, we may revise accrual amounts prior to resolution of a particular contingency based on changes in facts and circumstances or changes in the expected outcome. Currently, we are not able to estimate possible losses or a range of possible losses in excess of amounts accrued.
On April 25, 2018, and as amended on April 30, 2018, State Senator Andrew Dinniman filed a Formal Complaint and Petition for Interim Emergency Relief (“Complaint”) against Sunoco Pipeline L.P. (“SPLP”) before the PUC. Specifically, the Complaint alleges that (i) the services and facilities provided by the Mariner East Pipeline (“ME1,” “ME2” or “ME2x”) in West Whiteland Township (“the Township”) are unreasonable, unsafe, inadequate, and insufficient for, among other reasons, selecting an improper and unsafe route through densely populated portions of the Township with homes, schools, and infrastructure and causing inadvertent returns and sinkholes during construction because of unstable geology in the Township; (ii) SPLP failed to warn the public of the dangers of the pipeline; (iii) the construction of ME2 and ME2x increases the risk of damage to the existing co-located ME1 pipeline; and (iv) ME1, ME2 and ME2x are not public utility facilities. Based on these allegations, Senator Dinniman’s Complaint seeks emergency relief by way of an order (i) prohibiting construction of ME2 and ME2x in the Township; (ii) prohibiting operation of ME1; (iii) in the alternative to (i) and (ii) prohibiting the construction of ME2 and ME2x and the operation of ME1 until SPLP fully assesses and the PUC approves the condition, adequacy, efficiency, safety, and reasonableness of those pipelines and the geology in which they sit; (iv) requiring SPLP to release to the public its written integrity management plan and risk analysis for these pipelines; and (v) finding that these pipelines are not public utility facilities. In short, the relief, if granted, would continue the suspension of operation of ME1 and suspend further construction of ME2 and ME2x in the Township.
Following a hearing on May 7, 2018 and 10, 2018, Administrative Law Judge Elizabeth H. Barnes (“ALJ”) issued an Order on May 24, 2018 that granted Senator Dinniman’s petition for interim emergency relief and required SPLP to shut down ME1, to discontinue construction of ME2 and ME2x within the Township, and required SPLP to provide various types of information and perform various geotechnical and geophysical studies within the Township. The ALJ’s Order was immediately effective, and SPLP complied by shutting down service on ME1 and discontinuing all construction in the Township on ME2 and ME2x. The ALJ’s Order was automatically certified as a material question to the PUC, which issued an Opinion and Order on June 15, 2018 (following a public meeting on June 14, 2018) that reversed in part and affirmed in part the ALJ’s Order. PUC’s Opinion and Order permitted SPLP to resume service on ME1, but continued the shutdown of construction on ME2 and ME2x pending the submission of the following three types of information to PUC: (i) inspection and testing protocols; (ii) comprehensive emergency response plan; and (iii) safety training curriculum for employees and contractors. SPLP submitted the required information on June 22, 2018. On July 2, 2018, Senator Dinniman and intervenors responded to the submission. SPLP is also required to provide an affidavit that the PADEP has issued appropriate approvals for construction of ME2 and ME2x in the Township before recommencing construction of ME2 and ME2x locations within the Township. SPLP submitted all necessary affidavits. On August 2, 2018 the PUC entered an Order lifting the stay of construction on ME2 and ME2x in the Township with respect to four of the eight areas within the Township where the necessary environmental permits had been issued. Subsequently, after PADEP’s issuance of permit modifications for two of the four remaining construction sites, the PUC lifted the construction stay on those two sites as well. Also on August 2, 2018, the PUC ratified its prior action by notational voting of certifying for interlocutory appeal to the Pennsylvania Commonwealth Court the legal issue of whether Senator Dinniman has standing to pursue this matter. Sunoco submitted a petition for permission to appeal on this issue of standing. Senator Dinniman and intervenors opposed that petition. On September 27, 2018, the Commonwealth Court issued an Order that certified for appeal the issue of Senator Dinniman’s standing. The Order stays all proceedings in the PUC.
On September 27, 2018, the Commonwealth Court issued an Order that certified for appeal the issue of Senator Dinniman’s standing. The Order stays all proceedings in the PUC. Briefing in the Commonwealth Court has been completed and oral argument has been scheduled for June 3, 2019.


23

Table of Contents

On March 29, 2019, SPLP filed a supplemental affidavit with the PUC in accordance with the established procedure to request the PUC lift the stay of construction of ME2 for one of the remaining work locations in the Township Shoen Road. That same day, Senator Dinniman filed a letter objecting to SPLP’s request, arguing the Commonwealth Court’s order staying all proceedings barred the PUC from issuing an approval to lift the stay of construction of ME2 at Shoen Road. SPLP filed a reply to Senator Dinniman’s letter on April 4, 2019 explaining that the Commonwealth Court’s order did not prevent the PUC from lifting the stay of construction of ME2 at Shoen Road. On April 25, 2019, the PUC issued an Opinion and Order that it lacked jurisdiction to lift the stay of construction of ME2 at Shoen Road in light of the Commonwealth Court’s order staying proceedings in the PUC. That same day, SPLP filed an Application for Expedited Clarification to the Commonwealth Court, which seeks to clarify that the Commonwealth Court’s stay of proceedings does not prevent the PUC from issuing an approval to lift the stay of construction of ME2 at Shoen Road, or any of the other remaining work locations in the Township. Senator Dinniman’s response to SPLP’s application was filed on May 8, 2019, and oral argument is set for May 15, 2019.
No amounts have been recorded in our March 31, 2019 or December 31, 2018 consolidated balance sheets for contingencies and current litigation, other than amounts disclosed herein.
Environmental Matters
Our operations are subject to extensive federal, tribal, state and local environmental and safety laws and regulations that require expenditures to ensure compliance, including related to air emissions and wastewater discharges, at operating facilities and for remediation at current and former facilities as well as waste disposal sites. Historically, our environmental compliance costs have not had a material adverse effect on our results of operations but there can be no assurance that such costs will not be material in the future or that such future compliance with existing, amended or new legal requirements will not have a material adverse effect on our business and operating results. Costs of planning, designing, constructing and operating pipelines, plants and other facilities must incorporate compliance with environmental laws and regulations and safety standards. Failure to comply with these laws and regulations may result in the assessment of administrative, civil and criminal penalties, the imposition of investigatory, remedial and corrective action obligations, natural resource damages, the issuance of injunctions in affected areas and the filing of federally authorized citizen suits. Contingent losses related to all significant known environmental matters have been accrued and/or separately disclosed. However, we may revise accrual amounts prior to resolution of a particular contingency based on changes in facts and circumstances or changes in the expected outcome.
Environmental exposures and liabilities are difficult to assess and estimate due to unknown factors such as the magnitude of possible contamination, the timing and extent of remediation, the determination of our liability in proportion to other parties, improvements in cleanup technologies and the extent to which environmental laws and regulations may change in the future. Although environmental costs may have a significant impact on the results of operations for any single period, we believe that such costs will not have a material adverse effect on our financial position.
Based on information available at this time and reviews undertaken to identify potential exposure, we believe the amount reserved for environmental matters is adequate to cover the potential exposure for cleanup costs.
In February 2017, we received letters from the DOJ on behalf of EPA and Louisiana Department of Environmental Quality (“LDEQ”) notifying SPLP and Mid-Valley Pipeline Company (“Mid-Valley”) that enforcement actions were being pursued for three separate crude oil releases: (a) an estimated 550 barrels released from the Colmesneil-to-Chester pipeline in Tyler County, Texas (“Colmesneil”) which allegedly occurred in February of 2013; (b) an estimated 4,509 barrels released from the Longview-to-Mayersville pipeline in Caddo Parish, Louisiana (a/k/a Milepost 51.5) which allegedly occurred in October of 2014; and (c) an estimated 40 barrels released from the Wakita 4-inch gathering line in Oklahoma which allegedly occurred in January of 2015. In January of 2019, a Consent Decree approved by all parties as well as an accompanying Complaint was filed in the United States District Court for the Western District of Louisiana seeking public comment and final court approval to resolve all penalties with DOJ and LDEQ for the three releases. The Consent Decree requires certain injunctive relief to be completed on the Longview-to-Mayersville pipeline within three years but the injunctive relief is not expected to have any material impact on operations. In addition to resolution of the civil penalty and injunctive relief, we continue to discuss natural resource damages with the Louisiana trustees.
On January 3, 2018, PADEP issued an Administrative Order to SPLP directing that work on the Mariner East 2 and 2X pipelines be stopped.  The Administrative Order detailed alleged violations of the permits issued by PADEP in February 2017, during the construction of the project.  SPLP began working with PADEP representatives immediately after the Administrative Order was issued to resolve the compliance issues.  Those compliance issues could not be fully resolved by the deadline to appeal the Administrative Order, so SPLP took an appeal of the Administrative Order to the Pennsylvania Environmental Hearing Board on February 2, 2018.  On February 8, 2018, SPLP entered into a Consent Order and Agreement with PADEP that (i) withdraws the Administrative Order; (ii) establishes requirements for compliance with permits on a going forward basis; (iii) resolves the non-compliance alleged in the Administrative Order; and (iv) conditions restart of work on an agreement


24

Table of Contents

by SPLP to pay a $12.6 million civil penalty to the Commonwealth of Pennsylvania.  In the Consent Order and agreement, SPLP admits to the factual allegations, but does not admit to the conclusions of law that were made by PADEP.  PADEP also found in the Consent Order and Agreement that SPLP had adequately addressed the issues raised in the Administrative Order and demonstrated an ability to comply with the permits. SPLP concurrently filed a request to the Pennsylvania Environmental Hearing Board to discontinue the appeal of the Administrative Order.  That request was granted on February 8, 2018.
In October 2018, Pipeline Hazardous Materials Safety Administration (“PHMSA”) issued a notice of proposed safety order (the “Notice”) to SPMT, a wholly owned subsidiary of ET. The Notice alleged that conditions exist on certain pipeline facilities owned and operated by SPMT in Nederland, Texas that pose a pipeline integrity risk to public safety, property or the environment. The Notice also made preliminary findings of fact and proposed corrective measures. SPMT responded to the Notice by submitting a timely written response on November 2, 2018, attended an informal consultation held on January 30, 2019 and entered into a consent agreement with PHMSA resolving the issues in the Notice as of March 2019.
Environmental Remediation
Our subsidiaries are responsible for environmental remediation at certain sites, including the following:
certain of our interstate pipelines conduct soil and groundwater remediation related to contamination from past uses of polychlorinated biphenyls (“PCBs”). PCB assessments are ongoing and, in some cases, our subsidiaries could potentially be held responsible for contamination caused by other parties.
certain gathering and processing systems are responsible for soil and groundwater remediation related to releases of hydrocarbons.
legacy sites related to Sunoco, Inc. that are subject to environmental assessments, including formerly owned terminals and other logistics assets, retail sites that Sunoco, Inc. no longer operates, closed and/or sold refineries and other formerly owned sites.
Sunoco, Inc. is potentially subject to joint and several liability for the costs of remediation at sites at which it has been identified as a potentially responsible party (“PRP”). As of March 31, 2019, Sunoco, Inc. had been named as a PRP at approximately 38 identified or potentially identifiable “Superfund” sites under federal and/or comparable state law. Sunoco, Inc. is usually one of a number of companies identified as a PRP at a site. Sunoco, Inc. has reviewed the nature and extent of its involvement at each site and other relevant circumstances and, based upon Sunoco, Inc.’s purported nexus to the sites, believes that its potential liability associated with such sites will not be significant.
To the extent estimable, expected remediation costs are included in the amounts recorded for environmental matters in our consolidated balance sheets. In some circumstances, future costs cannot be reasonably estimated because remediation activities are undertaken as claims are made by customers and former customers. To the extent that an environmental remediation obligation is recorded by a subsidiary that applies regulatory accounting policies, amounts that are expected to be recoverable through tariffs or rates are recorded as regulatory assets on our consolidated balance sheets.
The table below reflects the amounts of accrued liabilities recorded in our consolidated balance sheets related to environmental matters that are considered to be probable and reasonably estimable. Currently, we are not able to estimate possible losses or a range of possible losses in excess of amounts accrued. Except for matters discussed above, we do not have any material environmental matters assessed as reasonably possible that would require disclosure in our consolidated financial statements.
 
March 31, 2019
 
December 31, 2018
Current
$
48

 
$
42

Non-current
289

 
295

Total environmental liabilities
$
337

 
$
337

In 2013, we established a wholly-owned captive insurance company to bear certain risks associated with environmental obligations related to certain sites that are no longer operating. The premiums paid to the captive insurance company include estimates for environmental claims that have been incurred but not reported, based on an actuarially determined fully developed claims expense estimate. In such cases, we accrue losses attributable to unasserted claims based on the discounted estimates that are used to develop the premiums paid to the captive insurance company.
During the three months ended March 31, 2019 and 2018, the Partnership recorded $6 million and $6 million, respectively, of expenditures related to environmental cleanup programs.


25

Table of Contents

Our pipeline operations are subject to regulation by the United States Department of Transportation under the PHMSA, pursuant to which the PHMSA has established requirements relating to the design, installation, testing, construction, operation, replacement and management of pipeline facilities. Moreover, the PHMSA, through the Office of Pipeline Safety, has promulgated a rule requiring pipeline operators to develop integrity management programs to comprehensively evaluate their pipelines, and take measures to protect pipeline segments located in what the rule refers to as “high consequence areas.” Activities under these integrity management programs involve the performance of internal pipeline inspections, pressure testing or other effective means to assess the integrity of these regulated pipeline segments, and the regulations require prompt action to address integrity issues raised by the assessment and analysis. Integrity testing and assessment of all of these assets will continue, and the potential exists that results of such testing and assessment could cause us to incur future capital and operating expenditures for repairs or upgrades deemed necessary to ensure the continued safe and reliable operation of our pipelines; however, no estimate can be made at this time of the likely range of such expenditures.
Our operations are also subject to the requirements of OSHA, and comparable state laws that regulate the protection of the health and safety of employees. In addition, the Occupational Safety and Health Administration’s hazardous communication standard requires that information be maintained about hazardous materials used or produced in our operations and that this information be provided to employees, state and local government authorities and citizens. We believe that our past costs for OSHA required activities, including general industry standards, record keeping requirements, and monitoring of occupational exposure to regulated substances have not had a material adverse effect on our results of operations but there is no assurance that such costs will not be material in the future.
11.
REVENUE
Disaggregation of revenue
The Partnership’s consolidated financial statements reflect the eight reportable segments, which also represent the level at which the Partnership aggregates revenue for disclosure purposes. Note 15 depicts the disaggregation of revenue by segment.
Contract Balances with Customers
The Partnership satisfies its obligations by transferring goods or services in exchange for consideration from customers. The timing of performance may differ from the timing the associated consideration is paid to or received from the customer, thus resulting in the recognition of a contract asset or a contract liability.
The Partnership recognizes a contract asset when making upfront consideration payments to certain customers or when providing services to customers prior to the time at which the Partnership is contractually allowed to bill for such services.
The Partnership recognizes a contract liability if the customer's payment of consideration precedes the Partnership’s fulfillment of the performance obligations. Certain contracts contain provisions requiring customers to pay a fixed fee for a right to use our assets, but allows customers to apply such fees against services to be provided at a future point in time. These amounts are reflected as deferred revenue until the customer applies the deficiency fees to services provided or becomes unable to use the fees as payment for future services due to expiration of the contractual period the fees can be applied or physical inability of the customer to utilize the fees due to capacity constraints. Additionally, Sunoco LP maintains some franchise agreements requiring dealers to make one-time upfront payments for long term license agreements. Sunoco LP recognizes a contract liability when the upfront payment is received and recognizes revenue over the term of the license. As of March 31, 2019, the Partnership had $378 million in deferred revenues representing the current value of our future performance obligations.
The amount of revenue recognized for the three months ended March 31, 2019 and 2018 that was included in the deferred revenue liability balance as of December 31, 2018 and January 1, 2018 was $76 million and $35 million, respectively.
The balances of receivables from contracts with customers listed in the table below include both current trade receivables and long-term receivables, net of allowance for doubtful accounts. The allowance for receivables represents Sunoco LP’s best estimate of the probable losses associated with potential customer defaults. Sunoco LP determines the allowance based on historical experience and on a specific identification basis.


26

Table of Contents

The balances of Sunoco LP’s contract assets and contract liabilities as of March 31, 2019 and December 31, 2018 were as follows:
 
March 31, 2019
 
December 31, 2018
Contract Balances
 
 
 
Contract asset
$
84

 
$
75

Accounts receivable from contracts with customers
467

 
348

Contract liability
1

 
1

Performance Obligations
At contract inception, the Partnership assesses the goods and services promised in its contracts with customers and identifies a performance obligation for each promise to transfer a good or service (or bundle of goods or services) that is distinct. To identify the performance obligations, the Partnership considers all the goods or services promised in the contract, whether explicitly stated or implied based on customary business practices. For a contract that has more than one performance obligation, the Partnership allocates the total contract consideration it expects to be entitled to, to each distinct performance obligation based on a standalone-selling price basis. Revenue is recognized when (or as) the performance obligations are satisfied, that is, when the customer obtains control of the good or service. Certain of our contracts contain variable components, which, when combined with the fixed component are considered a single performance obligation. For these types of contacts, only the fixed component of the contracts are included in the table below.
As of March 31, 2019, the aggregate amount of transaction price allocated to unsatisfied (or partially satisfied) performance obligations is $41.91 billion and the Partnership expects to recognize this amount as revenue within the time bands illustrated below:
 
 
Years Ending December 31,
 
 
 
 
 
 
2019 (remainder)
 
2020
 
2021
 
Thereafter
 
Total
Revenue expected to be recognized on contracts with customers existing as of March 31, 2019
 
$
4,454

 
$
5,048

 
$
4,503

 
$
27,906

 
$
41,911

Costs to Obtain or Fulfill a Contract
Sunoco LP recognizes an asset from the costs incurred to obtain a contract (e.g. sales commissions) only if it expects to recover those costs. On the other hand, the costs to fulfill a contract are capitalized if the costs are specifically identifiable to a contract, would result in enhancing resources that will be used in satisfying performance obligations in future and are expected to be recovered. These capitalized costs are recorded as a part of Other Assets and are amortized on a systematic basis consistent with the pattern of transfer of the goods or services to which such costs relate. The amount of amortization expense that the Sunoco LP recognized for the three months ended March 31, 2019 and 2018 was $4 million and $3 million, respectively. Sunoco LP has also made a policy election of expensing the costs to obtain a contract, as and when they are incurred, in cases where the expected amortization period is one year or less.
12.
LEASE ACCOUNTING
Lessee Accounting
The Partnership leases terminal facilities, tank cars, office space, land and equipment under non-cancelable operating leases whose initial terms are typically five to 15 years, with some real estate leases having terms of 40 years or more, along with options that permit renewals for additional periods. At the inception of each, we determine if the arrangement is a lease or contains an embedded lease and review the facts and circumstances of the arrangement to classify lease assets as operating or finance leases under Topic 842. The Partnership has elected not to record any leases with terms of 12 months or less on the balance sheet.
At present, the majority of the Partnership’s active leases are classified as operating in accordance with Topic 842. Balances related to operating leases are included in operating lease ROU assets, accrued and other current liabilities, operating lease current liabilities and non-current operating lease liabilities in our consolidated balance sheets. Finance leases represent a small portion of the active lease agreements and are included in finance lease ROU assets, current maturities of long-term


27

Table of Contents

debt and long-term debt, less current maturities in our consolidated balance sheets. The ROU assets represent the Partnership’s right to use an underlying asset for the lease term and lease liabilities represent the obligation of the Partnership to make minimum lease payments arising from the lease for the duration of the lease term.
Most leases include one or more options to renew, with renewal terms that can extend the lease term from one to 20 years or greater. The exercise of lease renewal options is typically at the sole discretion of the Partnership and lease extensions are evaluated on a lease-by-lease basis. Leases containing early termination clauses typically require the agreement of both parties to the lease. At the inception of a lease, all renewal options reasonably certain to be exercised are considered when determining the lease term. Presently, the Partnership does not have leases that include options to purchase or automatic transfer of ownership of the leased property to the Partnership. The depreciable life of lease assets and leasehold improvements are limited by the expected lease term.
To determine the present value of future minimum lease payments, we use the implicit rate when readily determinable. Presently, because many of our leases do not provide an implicit rate, the Partnership applies its incremental borrowing rate based on the information available at the lease commencement date to determine the present value of minimum lease payments. The operating and finance lease ROU assets include any lease payments made and exclude lease incentives.
Minimum rent payments are expensed on a straight-line basis over the term of the lease. In addition, some leases require additional contingent or variable lease payments, which are based on the factors specific to the individual agreement. Variable lease payments the Partnership is typically responsible for include payment of real estate taxes, maintenance expenses and insurance.
For short-term leases (leases that have term of twelve months or less upon commencement), lease payments are recognized on a straight-line basis and no ROU assets are recorded.
The Partnership maintains a small number of active related party leases.
The components of operating and finance lease amounts recognized in the accompanying consolidated balance sheet as of March 31, 2019 were as follows:
 
March 31, 2019
Operating leases:
 
Lease right-of-use assets, net
$
868

Operating lease current liabilities
68

Accrued and other current liabilities
1

Non-current operating lease liabilities
817

Finance leases:
 
Property, plant and equipment, net
$
2

Lease right-of-use assets, net
4

Accrued and other current liabilities
1

Long-term debt, less current maturities
7

Other non-current liabilities
2



28

Table of Contents

The components of lease expense for the three months ended March 31, 2019 were as follows:
 
 
Income Statement Location
 
Three Months Ended March 31, 2019
Operating lease costs:
 
 
Operating lease cost
 
Cost of goods sold
 
$
8

Operating lease cost
 
Operating expenses
 
17

Operating lease cost
 
Selling, general and administrative
 
3

Total operating lease costs
 
28

Finance lease costs:
 
 
Amortization of lease assets
 
Depreciation, depletion and amortization
 
1

Short-term lease cost
 
Operating expenses
 
11

Variable lease cost
 
Operating expenses
 
3

Lease costs, gross
 
43

Less: Sublease income
 
Other revenue
 
11

Lease costs, net
 
$
32

The weighted average remaining lease terms and weighted average discount rates as of March 31, 2019 were as follows:
 
March 31, 2019
Weighted-average remaining lease term (years):
 
Operating leases
21

Finance leases
10

Weighted-average discount rate (%):
 
Operating leases
5
%
Finance leases
8
%
Cash flows and non-cash activity related to leases for the three months ended March 31, 2019 were as follows:
 
Three Months Ended March 31, 2019
Operating cash flows from operating leases
$
(34
)
Lease assets obtained in exchange for new operating lease liabilities
8

Maturities of lease liabilities as of March 31, 2019 are as follows:
 
Operating leases
 
Finance leases
 
Total
2019 (remainder)
$
85

 
$
2

 
$
87

2020
96

 
2

 
98

2021
84

 
2

 
86

2022
71

 
1

 
72

2023
67

 
1

 
68

Thereafter
1,148

 
7

 
1,155

Total lease payments
1,551

 
15

 
1,566

Less: present value discount
665

 
5

 
670

Present value of lease liabilities
$
886

 
$
10

 
$
896



29

Table of Contents

Lessor Accounting
The Partnership leases or subleases a portion of its real estate portfolio to third-party companies as a stable source of long-term revenue. Our lessor and sublease portfolio consists mainly of operating leases with convenience store operators. At this time, most lessor agreements contain five-year terms with renewal options to extend and early termination options based on established terms specific to the individual agreement.
Rental income included in other revenue in our consolidated income statement for the three months ended March 31, 2019 was $36 million.
Future minimum operating lease payments receivable as of March 31, 2019 are as follows:
 
Lease Payments
2019 (remainder)
$
68

2020
72

2021
59

2022
53

2023
3

Thereafter
5

Total undiscounted cash flows
$